contact

Do you have a question, comment, request or suggestion? Then contact us. Would you prefer us to contact you? Then leave your details here.

Come and join our Dutch course on 27 February 2020: Design and maintenance of storage tanks according to PGS29

Get in contact

Do you have a question, comment, request or suggestion? Then contact us. Would you prefer us to contact you? Then leave your details here.

Visiting address

Nieuwland Parc 301-302
2952 DD Alblasserdam

Telephone number

078 – 691 9222

Email address

info@dcengineering.nl

Contact form

A15 from the east (Gorinchem/Arnhem) direction Rotterdam:

Take exit 22 Alblasserdam / Kinderdijk, keep left until traffic lights, direction industrial area Nieuwland. Turn left to Edisonweg, after 550 m at second traffic light turn right to Van Wenaeweg. Road turns into Nieuwland Parc, follow this with bend to the left. After 400 m you will find the D&C Engineering office on your right hand side just before the bend.

A15 from the west (Rotterdam/Dordrecht) direction Gorinchem:

Take exit 22 Alblasserdam / Kinderdijk, turn left to N915 direction Papendrecht. Turn right at traffic light to Edisonweg, after 550 m at second traffic light turn right to Van Wenaeweg, direction industrial area Nieuwland. Road turns into Nieuwland Parc, follow this with bend to the left. After 400 m you will find the D&C Engineering office on your right hand side just before the bend.

Closure Wantij Bridge N3 from 19 January to 3 April

The Wantij bridge (N3) will be renovated and, in order to be able to carry out the work safely, the bridge will be completely closed to cars, motorcycles and trucks from Sunday 19 January to Friday 3 April 2020. Emergency services, (moped) cyclists, pedestrians and public transport will be able to cross the bridge. Diversion routes are set for other traffic.

Later in 2020, weekend and night closures will be needed to replace the movable bridge parts and to test the bridge. In addition, major maintenance for the N3 will start in June 2020. The renovation of the bridge is expected to be completed in September 2020.

Traffic nuisance and diversion routes
In the period from Sunday 19 January to Friday 3 April 2020:

  • car and truck traffic via A15 and A16. Traffic must take into account extra travel time.
  • the diversion for dangerous goods transport is via A59, A27 and A15.
  • the bridge will not be served for ships from 6 January 2020 to October 2020. Ships will be notified via ship notifications.
  • local traffic must take into account extra traffic jams and delays during closure.

"Reach out to the sky with both feet on the ground."

error: Beschermde content

Registration form

Registration form

Your registration will only be definitive after payment has been received on the above account number. 

IBAN: NL40INGB0008704080
BIC: INGBNL2A
VAT: NL.8014.51.292.B01

PS: If you are unable to be present, you may be substituted by a colleague. If this is not possible, we charge € 25.00 administration costs. If you deregister later than 2 calendar weeks before the start of the course, you will not receive a refund of the full course amount.